WiP - February

Ah, finally February - no one was sick! There was a few more snow days than I would have liked, but we mostly survived them. And I got back into the routine of sewing, which led to lots actually getting done for once.

Like my brother-in-law's Army uniform quilt - a Christmas present finally received!

And my pink flying geese swap mini!

And my own table runner, finished before Valentine's Day! {Give or take five years.}

I also finished another t-shirt quilt - I'm waiting for my friend to receive it before I post about it.

Made three sets of BOMs Away - two Tic Tac Toe blocks for an Instagram friend and four Jack's Chain blocks.

And the second Eternal Bloom block, which was...not the easiest. But done!

I pulled out a mini-project, which turned out to not be quite that mini. It's the leftover pieces from Shivaun Place - the pattern contained a mini pattern for the half- and quarter-square triangle cutoffs. I changed it a bit to echo the design of the quilt, and it ended up about 30" square. It was supposed to be a pillow for my sister-in-law...I suppose everyone needs a giant pillow? Anyway, finishing it is my OMG goal for March.

In addition to the other t-shirt quilt, I made three more t-shirt quilt tops, and I'm working on piecing the back for one of them. She asked for her Half Fanatics number as the backing - those letters are 20" high! Should be an awesome back.

And I pieced a random little top! I dragged the Little Man around the quilt show last October, so he got a reward at the end - these pilot bears panel and a fat quarter. I was going to fold them up and put them in a box while cleaning, but...I had some time, so I threw the top together. So it's a little closer to being an actual quilt!

And for my leader/ender, I worked hard on getting this QOV nearer to being an actual quilt. I'm down to the last four patches to get it all together - whew! I feel like I've been making four patches foreeeeeeever.

So that's February! I've got a good bit of stuff to quilt in March, so hopefully the snow tapers off so I can get to the rental place more often. Seriously, now - it's currently snowing and I'm scheduled for Wednesday...

See also: Monday Making, Main Crush MondayFabric Tuesday, Scraptastic Tuesday, Rainbow Scrap ChallengeOh Scrap!Whoop WhoopNeedle & Thread ThursdayLet’s Bee SocialDesign Wall MondayWiP on WednesdaysOne Monthly Goal, Midweek Makers