Weekly Progress - MORE SNOW!

We did get the winter storm they predicted last week, and it was about as good as Oklahoma gets.

{Yeah wind, blast that tree!}


We lost power overnight, so I shoveled myself to the car to check Facebook. Luckily it was back by 10 am....other friends out here were not as lucky!

{Of course I had to make french toast! I had bread, eggs, and milk!}

Of course, my dear husband decided that the middle of a snowstorm was the best time to tell me we were moving back to Spokane, WA. You know, the place that got something close to 100" of snow the last winter we were there.

He's buying me a snowblower for my birthday.

Anyway... I waited until the end of the month to get anything significant done on my sewing projects... Good thing for those monthly link-ups to keep me moving! So while it looks like I did a lot this week, really, most of the stuff was near completion and I just finished it off.


{Finished!} Layer Cake Snowballs - post here.

{Finished!} Starburst Pillow - I'm really glad I went with a pillow instead of a quilt. I know it wouldn't have gotten done if I tried for a whole quilt. The quilting is based on Karamat's Mini-Swoon Swap - I wanted to practice before tackling my Swoon!

{BOM} I started putting together the Sampler, but quickly ran out of the black. Go figure - you need a lot of that!

 {Design Wall} All the pink blocks for Boardwalk. It will not look this pink! I ironed and started cutting the teal fat quarters today.


{Rainbow Scrap Challenge} These have been finishing up throughout the month as little leaders/enders. March is orange, which will be hard - I don't have a lot of it.

My new Flirt project is mostly cut out and strip sets are forming. And look - it's the ONLY thing on the cutting table!

I also made a set of Cat Tails. But I don't remember which set it was. One of these...

Oh, and I did this. Yes, the medal is bigger than my hand. Yes, I beat my Tulsa time. Yes, hills make your butt hurt. A LOT.

{Fifteen Minute Challenge} I took a deep breath and plunged into the horrors of the scrap box, where bags of old projects are sent to never be sorted. Stuff I want to keep together are now boxed and labeled. And I have a bigger pile of scraps to re-sort into colors. {Still not enough orange!}


Linked:
Fifteen Minute Challenge @ Life In Pieces



End of Month Report - February

Man, this short month went a bit too fast! Who ever decided that February should get shortchanged? Darn you, Caesar! What was so wrong about making January, February, and March all 30-day months?

Family: We got orders! Surprisingly early! Back to Fairchild AFB, WA. There are a lot of mixed feelings about this...but at least the place makes us happy. We'll move sometime this summer - school doesn't start until after Labor Day {and Oklahoma gets out before Memorial Day} so we have a lot of time to work with.

Adoption: Still waiting to hear the revised timeline and requirements...and trying not to worry. I'm hoping we know before we schedule the move - obviously, it would be nice to be settled before the Little Man comes home.

Running: Little Rock Half is this weekend, and I feel insanely prepared. At some point, full marathon training stopped being tiring and started being, "oh, no biggie, I have a 2:30 long run this weekend. AND I WILL DO IT IN 2:20!!"

Sewing: I planned, this month, to... 

Ah, no. Finished Snowballs under the wire {post will be up tomorrow} but Star isn't even basted.


Pick 16 Saturday Sampler blocks to set on point and do that

Yes! Not only that, but all the on point blocks are sashed and I started putting together the other blocks. And then I ran out of fabric. Man, when you have a lot of negative space, you need a LOT of that fabric!

 
Figure out what I'm doing with Boardwalk and make at least ten blocks

Uh, sure. If you count slicing the setting pieces as "making blocks."

 
Keep up with one Cat Tails block each week

Yes, I'm up to nine blocks. And out of space on the design wall, again! Four more to go...I think. I should really come up with a plan...


And then also...

Starburst Pillow - I love it! I'm really glad I decided to make it pillow-size. Now I can enjoy it instead of letting it linger on the to-be-quilted pile.

Rainbow Scrap Challenge - ten cute little purple blocks!

And then there's my NewFO. I did not plan on a NewFO this month. I blame my mother-in-law - she ordered me quilt magazine subscriptions for  Christmas. I couldn't resist making this one in Flirt!

As for March...it's got Spring Break and two half marathons, so I'll try not to be overly ambitious.

1. Keep up with Cat Tails - I should finish the cat blocks and have them ready to set in April.

2. Quilt Star Wall Hanging, Frolicking Pinwheels, and Skorca. {I know, three. But two are small and should not take that long! And I know I'm going to keep putting Skorca off.}

3. Make a new Creeper pillow for the Dude's birthday. {The first one went to a friend. The second will be properly pixelated.}


4. Make at least half of the fourteen remaining blocks for Boardwalk. Luckily, they're all blue/teal, so the pink will be balanced.

Linked:

Weekly Progress - SNOW!

First a little bit of snow - about 3" that canceled school. 

{Lumps the Snowman}

And now, the big storm. Or not. I'm writing this Sunday night and we still have no idea if it will be snow or rain. School has already been canceled, so we'll see! At least I'm over the sinus crud, so I can enjoy...shoveling.

And now that it's morning, it's still unsure if it's going to be snow or rain! I watched it go from rain to sleet to snow to sleet to rain all over the course of thirty minutes.


{Design Wall/BOM} Saturday Sampler, at the point in which it will no longer fit on the wall. I'm {fairly} confident in my math and starting the work to pull it together. I should have an empty design wall by the end of the week!

I realized February is almost over...with no UFOs started finished. Oops. So I got out Layer Cake Snowballs and got started. 

{This isn't comfortable, but it's annoying, so the cat continues.}

So far, I echoed the lines of the blocks. I think it needs more...but I don't know what. I don't particularly want to outline all the corners because I don't want to bury all those threads!


Then I used the {perfectly} leftover batting to baste the Starburst pillow cover. Only made it through three lines before running out of thread, though...and probably won't be running to Hobby Lobby today!


{Fifteen Minute Challenge} Green box is organized! And I don't think there's a bit of the Pantone Emerald in it.
Next I'm going to tackle the random scrap/project box. That should take a couple weeks.

Weekly Progress - the Creeping Crud

Yesterday was a day off, so I forgot all about posting. It doesn't help that my husband and I both have the basic winter-y sinus crud, so I barely got anything done this week. So this will be short and sweet before my next nap. I hate being sick!

{Finished} Triple Zip Pouch

{Design Wall/BOM} I finally decided to trust my math {after triple checking it 4x} and started setting Saturday Sampler. I need to pick four more from the top to set on point - there's also four in progress by the sewing machine.

{Fifteen Minute Challenge} I finished organizing the Christmas scrap bin, including yardage and fat quarter sets. It's ready to {sadly} be packed away until after the move.
I then pulled out my solids bin and fished out any black that could be used for the Sampler, then moved to the green scrap bin for organizing. There's another Creeper pillow in my future.

So...really slacking on the UFOs this month. At least I haven't added anything to the to-be-quilted pile other than the Starburst pillow, which is ready to quilt once I can sit up longer than five minutes.

Linked:

Weekly Progress - Giveway Winner!

Last week was busier than normal, for no real reason. Just a lot of other stuff that kept me from the sewing room. So not much progress in there.

But first, a winner!

Which is SewCindy! Congrats, I shot you an email!

{BOM/Design Wall} No change on Saturday Sampler. I have a good sketch and hopefully good math on the layout, and another 3.5 yards of the black to start setting it. Once I double check my math again.

{Cat Tails} Block #7!

{Boardwalk} The centers of the three pink blocks are done.

{Starburst Quilt Along} Block is finished, backing is prepped, and I've even decided how I'm going to quilt it!

{Fifteen Minute Challenge} Now this I actually have been working on daily! I decided to tackle the Christmas scrap box, so it could be fully organized and packed up for our house sale. And it is taking the full fifteen minutes every day. Please, no one let me buy any Christmas fabric this year. I don't care how cute Sandy Gervais' line is going to be.

Linked:
Fifteen Minute Challenge @ Life In Pieces
Design Wall Monday @ Patchwork Times 
BOMs Away Mondays @ What A Hoot 
WiP Wednesday @ Freshly Pieced
Starburst Quilt Along @ Happy Quilting